Kitchen Remodel Cost in Saugus, CA

An 8 minute read

Short answer

According to the Remodeling 2025 Cost vs Value Report (www.costvsvalue.com), one 200 square foot kitchen in the Los Angeles metro costs $29,765 for a minor remodel that keeps the cabinet boxes, $86,214 for a midrange gut and $171,369 for an upscale one. Those are regional averages, not a quote for your house. Below, a kitchen budget is split into the eleven lines a contract lists, so you can see where the money goes and which lines your own choices move.

Sorting kitchens into good, better and best hides the structure that matters: a kitchen is a stack of trades, each with its own crew, its own material and its own week on the calendar. Change one line and the lines beneath it move. A heavier slab has to be carried by the cabinet boxes below it. Move the range and the gas line, the outlet and the hood duct move with it.

Instead of tiers, consider a single house: a 200 square foot kitchen in a Saugus tract home off a cul de sac in the 91350 ZIP code, which the Postal Service lists under Saugus, one wall of windows, the sink under the window, a peninsula being removed, and cabinets original to the house.

A worked example, not a quote from us. Each share is the published split of where a kitchen budget goes.

Cabinetry and hardwareBoxes, doors, drawers, hardware, delivery, and the labor to scribe them to walls that are not straight
29%
InstallationThe labor that installs all of it. Most quotes fold this line into the others, so it is shown here on its own
17%
Appliances and ventilationRange, hood, dishwasher, refrigerator. You may purchase them yourself, but they remain in the total either way
14%
CountertopsSlab, template, fabrication, sink cutout, edge, seam and set
10%
FlooringMaterial, underlayment, any leveling, transitions at the doorways
7%
Walls and ceilingsPatching, ceiling and walls, base and casing, caulk lines, touch up after the last trade leaves
5%
LightingCans, under cabinet, switches, and the circuits that feed them
5%
Design feesMeasured drawings and the plan every trade on the job builds from
4%
Doors and windowsAnything that moves in an outside wall, or a new opening through to the next room
4%
Faucets and plumbingSink and disposal, dishwasher supply and drain, shutoff valves, any refrigerator water line
4%
OtherPermits, disposal, and the small things that fit under no other heading
1%
TotalOne kitchen, gutted and rebuilt, every line counted once
100%

The percentage against each line is the split the National Kitchen and Bath Association publishes for where a kitchen budget goes. The contractor did not price this kitchen. Multiply your own budget by each share and you have a first draft of every line, which you can check against the quote.

The contractor can usually tell which of these you have in one visit.

Ask for a price
Worth knowing. In the association's budget split, cabinetry and countertops together take 29 and 10 percent, 39 of every 100 dollars. Settle those two and most of the budget is settled.

Remodeling to sell is a different question, covered in remodeling the kitchen before you sell.

Your quote from the contractor will not look exactly like that, and it should not. It will carry a line the published split does not include: a named allowance held back for what the demolition uncovers, with the unspent portion returned to you. It will also separate the strip out and the permit fees rather than folding them into a heading called other. It keeps the same shape, one line per trade, so you can compare it against the numbers above.

Reading the lines

Strip out is the cheapest line, and the one people most often take on themselves. It is reasonable work if you have space for a truckload of old cabinets and a way to transport them. What you cannot do yourself is cap a gas line or pull a live circuit, and a stripped kitchen with an open wire in it holds up every other trade.

Electrical usually costs more than expected, because a kitchen built for an earlier decade was wired for far less demand. Two circuits and a ceiling fixture was normal. A kitchen now requires dedicated runs, protected outlets and task lighting over the work surfaces, so the wall is opened, and the drywall repair reappears further down the ledger under the paint line.

Plumbing stays a small line while the sink remains under the window, and becomes a large one as soon as it moves. If you are considering that move, read what happens when the sink moves before setting a budget, because it changes three lines at once.

A roll off dumpster in a driveway half filled with kitchen demolition debris and broken tileA dumpster outside a suburban house half filled with kitchen demolition debris, old cabinet carcasses and broken tile.

Cabinets and countertop, the two biggest lines

Cabinets are the largest single number in almost every kitchen, and the widest spread. The same layout can be built in a stock box with a plain door, or in a box built to the size of your wall with drawer glides that keep closing softly for years. If the boxes you have are solid, keeping them is the single largest saving on this ledger, and the cabinet page covers how to judge that.

Countertop is a material decision followed by a labor cost. The slab price is public. Fabrication is not, and a seam placed in the wrong spot costs nothing extra on the invoice but stays with you for as long as you own the house. Countertop material covers what differs between the stones.

If your room matches none of these, say so and the contractor will tell you which way it leans.

Ask for a price
Removed cabinet doors leaning in a row against a garage wall, each numbered with masking tapeRemoved cabinet doors leaning in a row against a garage wall, each one numbered with a strip of masking tape.
Worth knowing. The allowance line keeps a quote accurate. A quote with no allowance is not cheaper. It simply omits the part nobody can price until the wall is open.

Permits are a real line, not a formality

Santa Clarita amends the state building code, and its exemption list is narrower than it appears. Countertops sit on that list, next to tiling, flooring and similar interior finish work, and cabinets under eight feet in a house are exempt as well. The same section then adds that unless otherwise exempted, separate plumbing, electrical and mechanical permits will be required for those items. You can read the city's exemption section in full. In practice, swapping a counter alone is exempt. Swapping a counter, adding an outlet and moving a drain is not.

The city's Building and Safety office puts the duty to obtain the necessary permits on the property owner, before a building is constructed, repaired or altered. The permit record carries the property owner's name, not the crew's. More on how that works on the permits page.

The permit question also decides who may legally do the work. Once a kitchen needs a permit, it needs a licensed contractor too, whatever the invoice total.

A single opened stud bay in a kitchen wall showing existing wiring, a capped copper supply line and old wood blocking, with a tape measure on the window sillAn open kitchen wall with the drywall cut back between two studs, showing existing wiring, a capped supply line and old blocking, taken in daylight with a tape measure lying on the sill.

Worth asking before you commit to a scope.

Ask for a price

An outside check on the total

This ledger describes one house. To judge whether a total sits where it should, compare it against a figure published by an independent source. The Cost vs Value Report prices one fixed kitchen, 200 square feet with 30 linear feet of cabinets, three ways across the Los Angeles metro. A minor remodel that keeps the boxes and replaces the doors and drawer fronts, counter, sink, one appliance and paint costs $29,765 and returns $37,768 at resale, 126.9 percent recovered. A midrange major remodel, with everything replaced, semi custom cabinets and a new layout, costs $86,214 and returns $49,079, or 56.9 percent. An upscale major remodel, with custom cabinets, stone and commercial grade appliances, costs $171,369 and returns $65,023, or 37.9 percent.

Those are metro figures for greater Los Angeles, not the contractor's quote and not a Saugus price. Use it for proportion rather than as a figure. The pattern is clear: only the smallest scope returns more than it costs. Any scope above it is bought because you want the kitchen, not because it returns its cost, and that is the sound basis for the decision.

Is a round number enough

Is $10,000 enough for a kitchen remodel?
For a full kitchen, no. For a targeted one, yes. It covers a counter, a sink, paint and a floor, or new doors and drawer fronts on boxes that are still sound. It does not cover new cabinets, and it will not absorb the cost of opening a wall. Applied to the right line, it is the best value on the ledger.
Is $20,000 enough for a kitchen remodel?
Usually, for a kitchen that keeps its layout. Cabinets, counter, floor and finish at a modest material level, with the sink and range remaining in place and the electrical limited to what code requires. It leaves little room for surprises, so the allowance line matters more at this figure than at any other.
Is $30,000 enough to remodel a kitchen?
It covers a full replacement in a kitchen this size at a sensible material level, layout intact. It does not usually cover moving plumbing, taking out a wall, or a cabinet package built to size. Say which of those you want and the contractor will show you which line absorbs it.
Why not just publish a price per square foot?
Because square footage barely drives the number. Two kitchens of identical size can land far apart on the cabinet line alone, before anyone has discussed the counter. A per foot figure has to be corrected at the first site visit, so it is a poor place to begin.

When the contractor quotes, it comes back in this format, with your own figures on each line and the scope written next to each one. If a line looks high, you can see what is inside it and change that line instead of disputing a total. How long it takes follows the same order, because the cost and the schedule move together.

A printed multi page scope of work lying open on a kitchen counter beside a penA printed multi page scope of work lying open on a kitchen counter beside a pen, the text not legible.

Ask for this ledger with your numbers in it

Send the room dimensions and what you want changed, and the contractor fills in the lines for your house. Call (661) 430-7779, or send it through the contact form and it reaches us directly.

Ask for a price

Kitchen Remodel Saugus, CA. A referral service for kitchen remodels in Saugus and the Santa Clarita Valley. A licensed contractor does the work.

© 2025 Zonda Media, a Delaware Corporation. Complete data from the Remodeling 2025 Cost vs Value Report can be downloaded free at www.costvsvalue.com.

Saugus, California · (661) 430-7779

How this works · How we handle your details · Site terms · Accessibility · Talk to us

2026 Kitchen Remodel Saugus, CA

Call Text Ask for a price